REGAS SQUARE | Regas Square Construction February 2018
Redefining Urban Living in Knoxville Through Location and Design.
February 2018 regas updates, February 2018 construction regas square
1526
page-template-default,page,page-id-1526,page-child,parent-pageid-1353,ajax_fade,page_not_loaded,,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-9.2,wpb-js-composer js-comp-ver-4.11.2.1,vc_responsive
 

February 2018

Scroll Down for Images

The second floor condos are taking shape, and the third floor will be prepared for concrete by the end of the month. Note how the common area courtyard is shaping up.